INSTALLATION PLANNING

📌 PHYSICAL NETWORK INSTALLATION PLAN FOR OFFTUBE 🔩🖥️

📅 Date: [Add date]
🏢 Company: Offtube
📩 Manager: [Add name]


1️⃣ PURPOSE OF THE DOCUMENT 🎯

This document defines all the necessary steps for the physical network installation, including cabling, equipment placement, and final verification.
The goal is to ensure a well-structured, organized, and functional network, following best practices for security and efficiency.


2️⃣ REQUIRED MATERIALS 🛠️

🔌 Network Infrastructure:

  • 📡 Main Router: MikroTik RB5009UG+S+IN

  • 🔌 Managed Switch: TP-Link TL-SG3428X

  • 📶 WiFi Access Point: Ubiquiti U6-Pro (x2)

  • 🔋 UPS: APC Back-UPS Pro BR900G

  • 📎 Patch Panel: DIGITUS Cat6

  • 🔩 Network Rack: StarTech RK12U

🛠️ Cabling and Connections:

  • 🌐 Ethernet Cable: UGREEN Cat6 (10m & 20m runs)

  • 🔌 Power strips and outlets

  • 📏 Zip ties and cable ducts for cable management


3️⃣ INSTALLATION STEPS 📋

🔹 Phase 1: Space Preparation

✅ Review of physical space:
🔍 Analyze the layout to define locations for router, switch, and rack.
📍 Mark cabling routes and connection points.
📏 Measure distances to calculate Ethernet cable lengths.


🔹 Phase 2: Rack and Core Equipment Installation

🛠️ Assemble the network rack:
📦 Unbox and mount the rack to the wall or floor.
🔩 Install the patch panel inside the rack.

🔌 Install core devices:
1️⃣ Place the router in a centralized location.
2️⃣ Connect the switch to the rack and router via Cat6 cable.
3️⃣ Connect the UPS to protect equipment from power outages.


🔹 Phase 3: Cabling Deployment

📍 Steps:

  • Install cable ducts for routing.

  • Run Cat6 Ethernet cables from the switch to endpoints and access points.

  • Connect cables to the patch panel and label each for easier management.

  • Test cable continuity with a network tester.

⚠️ Best practices:
✅ Avoid bending cables to maintain performance.
✅ Separate data and power cables to avoid interference.


🔹 Phase 4: WiFi Access Point Configuration

📶 Position access points strategically for optimal coverage.
🔌 Connect access points to the switch via Ethernet.
📲 Configure WiFi with MAC address filtering (admin devices only).


🔹 Phase 5: Device Connection

💻 Connect laptops to the switch via Ethernet or WiFi.
📡 Assign VLANs to segment traffic (clients, admins, servers).
🔍 Check inter-device connectivity.


🔹 Phase 6: Testing and Final Validation

✔️ Network functionality check:
📶 Test speed and connection stability.
🔗 Check communication between devices.
🔥 Test firewall and VLAN segmentation.

🛑 UPS Test:
Simulate a power failure to confirm continued operation.

📌 Final documentation:

  • Create a physical network map.

  • Record key configurations for future reference.


4️⃣ CONCLUSION 📌

Following this plan, Offtube will have a stable, secure, and well-organized network, optimizing connectivity and management. 🎯🔧
📩 After installation, any changes will be documented and final tests performed before production launch! 🚀

Leave a Comment

Esta web utiliza cookies propias y de terceros para su correcto funcionamiento y para fines analíticos y para mostrarte publicidad relacionada con sus preferencias en base a un perfil elaborado a partir de tus hábitos de navegación. Contiene enlaces a sitios web de terceros con políticas de privacidad ajenas que podrás aceptar o no cuando accedas a ellos. Al hacer clic en el botón Aceptar, acepta el uso de estas tecnologías y el procesamiento de tus datos para estos propósitos.